메뉴 건너뛰기

XE Basic

Project Stories

Yor are here:

       
   

 

  Reference Projects

 
       

 

 

 

 

COEX MALL

 

The  COES  is  opened  and  now  facing  12  years  now  at Samsung-Dong, Gang-Nam-GU, Seoul. Floating population is over 200,000 people and this mall is largest shopping mall in Korea  and  business  facilities  are  concentrated  in  this  region and the area is 464,000m2. This COES is consisting of World Trade Center, underground shopping mall, convention center, business  buildings,  hotel,  department  store  and  airport terminal.  The  safety  and  protection  of  facility  and  floating population is the main issue. Never doubt, the situation needs to be in security.

 

Our M R ENGINEERING’s Lighting Control System is operating for 12 years expect on Hotels and Department store but all the others (Convention center, business facility, shopping mall and terminal) are installed with out Lighting Control System. The  maintenance  contract  has  been  operating  for  once  a month  and  the  regular  system  inspection  and  also  the performing  perfect  lighting  control  system  by  administrator who  is  practiced  perfectly  with  our  system  awareness.  This place  is  also  installed  with  LCP  that  has  stable  and  perfect Stand-Alone function at each of EPS room. Each control panel is managed with 3 steps of protection. Even when the main monitoring  panel  is  having  trouble,  the  independent  CPU from LCP and relay that can be controlled by manual switch and other is operating under 3 steps of protection. The  newly  product  that  has  been  improved  is  installed  and managed  by  each  area’s  feature.  To  existing  system,  the UPGRADE system is easy to be combined. Our New Product, the STS (Smart Touch Switch) is multi-function switch and it is expected suitably for re-installation.

 
   coex.png  
 

 

Oh-Song Life Science Valley

 

The  Oh-Song  Life  Science  Valley  is  located  at  Oh-Song  village, Cheong-Won-Gun,  Chungbuk-Do  region.  It  completed  at October,  11,  2010  and  the  six  national  organization  (Food  & Drug Organization, Food & Drug Safety Evaluation Organization, Disease  Control  and  Prevention  Center,  National  Institutes  of Health,  Health  Industry  Development  Institute  and  Institue  of Health & Welfare Organization) under the Department of Health &  Human  Service  Administration  is  successfully  moved  to  this valley. Total area is 400,245m2 and working personnel is 2,400 people.

Our ILC System is currently installed & managed by configuration of 2,000 switches and 10,000 relays in 16 buildings. Especially, the  each  fluorescent  light  of  general  testing  lab  and  animal testing lab has individual ADDRESS to manage the DALI system for each lighting’s dimming control. It controls the brightness of lighting  and  provides  the  optimal  conditions  for  each experiment.

Also,  the  facility  operators  as  national  institutes  are  expert  at managing the Smartrol which is the lighting control software at PC  and  always  monitoring  the  sites  of  each  15  buildings  from central control room.

 
 

 

 

 

 

 

 

 Image_078.png

 

 
 

Image_081.png

 

 

Yeo Su MVL Hotel

 

Sea of five star hotel, the Yeo-Su MVL Hotel is built in beautiful  seaport  of  Yeo-Su.  This  hotel’s  name  is stands for MVL ‘Most Valuable Life’ and like this name, simply  staying  in  this  hotel  will  make  most  valuable moments  of  your  life.  This  hotel  is  luxury  and  it provides  multi  services  and  various  high-quality lifestyles. Many sights and peak of Oh-Dong Island is open widely with Yeo- Su Expo.

 
 

Our  system  is  configured  with  electric,  lighting  and  facility  control  system.  Our  company’s  MMI  of  Smartrol  is interfacing every system and also the electric control system is interfacing with other company’s product (GIPAM and GIMAC from LS electrics). The lighting control system is configured with GE relays to control the view lightings and inside of buildings. The facility control system is configured with VERSAMAX PLC and RX3i of GE PLC. It is monitoring and controlling the heating system and HVAC system inside of building.

It supports the graphic registration & Smartrol point smoothly after extending the points of lighting control and GE PLC through exchanging ideas, several years of management know-how and training with management team.

 

 
 

 

Sindorim D-Cube City

 

The  D-Cube  city  is  located  at  Sindorim  subway  station where the subway 1 line and 2 line is near and the culture complex  space  that  has  hotel,  residents  room,  culture, restaurant and park. Also this is configured with 8 AC of various theme space, art center (that has 1,300 seats) and D- Cube APT and office and also the first class Seoul D-Cube  City  hotel  for  business  and  hybrid  shopping  mall that connects with nature space and circular building. Like above, it emerged as new land mark of west-south area of  Seoul  that  can  solve  the  low  shopping  &  restaurant

 

 

Image_083.png

 

 
 

We have constructed with local relay (LR9P) for the indoor lighting control for D-Cube office (9th ~ 25th floor) and entire public place of D-Cube APT (51th floor) and the lighting control of 15th floor of office is running with touch switch  and  DALI  (Digital  Addressable  Lighting  Interface)  controller.  The  electric  control  system  is  controlling  and monitoring with GE digital meter (EPM 5500) and GE protection relay (F 650) which provided the main power from cogeneration plant inside of D-Cube City. Lighting  Control  :  Resident  (MLC  1,300  points),  Non-Resident  (MLC  660  points)  Electric  Control  :  GE  F650,  GE EPM5500, GE FANUC VMC

 

 
 

 

Yong-In Everland

 

The area of resort is 1,480,000m2 and the area of amusement park  is  30  square  meters.  It  opened  as  country’s  first  family natural plantation park since April, 1976. After March, 1996, it renamed as EverLand. Currently,  the  entire  EverLand  is  under  management  of  our Lighting Control System and about 212 panels are controlling the  entire  lighting  at  EverLand  (amusement  park)  and Caribbean Bay (water park). Especially, the EverLand is under control  by  Ethernet  communication  line  for  40EA  of  lighting control  panels  and  the  Caribbean  Bay  is  under  control  for 70EA of lighting control panels. Also the Globe pair has 40EA of lighting control panels. The  electric  heater,  outdoor  fountain  and  air-conditioner  are managed by time schedule which is connected to our lighting control relay. The  facility  operators  are  expert  at  controlling  the  entire EverLand with our lighting control and also the electric heater and air-conditioner. Recently,  we  have  delivered  our  product  to  additional construction part of EverLand.

 

 

 

 

 

 

 

 

Image_084.jpg

 

 
 

 

Su-Won, Hwa Seong Palace

 

 Image_086.jpg

 

 

 

The UNESCO World Heritage SIte of Su-Won, Hwa Seong is area of 130ha and the length reaches about 5.7km. Our lighting control is controlling the Su-Won, Hwa Seong and  also  at  the  inside  of  palace  is  under  management  of our lighting control system.

Currently,  the  entire  44  EA  panels  are  controlling  the  Su-Won,  Hwa  Seong  and  the  Palace  is  controlling  10  EA panels.  The  communication  is  connected  for  wireless method to solve the problems of failure of communication due to distance. Before  our  lighting  control  is  managing  the  place,  the operators are needed to walk all over the place and palace but  after  our  lighting  control  system  is  constructed,  they can  control  the  system  from  the  controlling  building  with simple  operation  of  computer.  Also  because  the  Su-Won, Hwa  Seong  is  located  at  outdoor,  it  uses  the  sunset  / sunrise time schedule to control the lighting. We have delivered the products for additional construction recently.

 
 

 

Doo-San We’ve The Zenith, Haeundae, Bu-San

 

Item : Electric and Lighting Control (1,546 points) The  Doo-San  We’ve  The  Zenith  is  the  tallest  building  in country and located at Bu-San. The We’ve The Zenith is the complex resident building and it  is  the  5th  floors  to  underground  and  70th  and  80th floors to top and also it is the consist of 3 buildings. The  A,  B  and  C  buildings  and  public  area  and  outdoor lighting in under control of our lighting system which has the 1,564 points of relays. The outdoor lighting & scene lighting  is  operated  by  schedule  and  it  gives  the convenient and efficient to operators.

 
  Image_089.png  
 

 

Home Plus

 

 Image_080.png

 

 

 

The HomePlus is the large discount store that is the second biggest  one  in  Korean  discount  market.  Our  company  has installed and constructed the lighting control at 50 HomePlus stores  including  An-Dong,  Go-Yang  Terminal  and  recently opened  Bu-San  stores.  In  condition  of  large  store,  when black  out,  many  causalities  happens  due  to  lighting’s  OFF because  of  that,  from  the  beginning  time  of  designing  the building, must consider to install the lighting control that can provide the Light’s On / Off control by Stand-Alone function. Our  system  is  perfectly  recognized  at  this  kind  of  situations and has been installed on many stores. Also, it controls the outdoor street light and advertising light by sunset / sunrise time  from  our  own  S/W  Smartrol  and  also  through  the photo-sensor, it controls the halogen light that is installed at escalators and other various lighting to save the energy.

An-Dong  Store  :  Lighting  Control  System,  Point  (RELAY)  : 781, Control Card (SRCC48) : 24

Driving Card (SRRDC12) : 69

Photo-Sensor (RPCON) : 1 Interface Device (SRLINK/RDPWR) : 1

 

 
 

 

Sejong City Government

 

 In early 2014, we have received the order of Sejong City Government Office which is the largest project of government project from PPS. We have win the bidding for area 1 & 2 of Sejong City Government Office through proposal by negotiating with public procurement service (PPS) and our company name has been widely known to people once again.

 

In 2014, we have become one of the leading Lighting Control Company in S.Korea. While our competitors stick to the old system and lower the price to concentrate on ordering, we invested in the development of technology and new technology rather than the amount and in result, we received the order by winning the bid with our proposal from negotiating with PPS. This caused the impact to market. This project started the construction with this result, with the step-by-step and accurate material supply and installation we have successfully completed the construction. Therefore, we were able to keep the promise of the perfect construction of the technology and installation and commissioning proposed in the proposal. As a result, we were able to comment of the success story of this project in our autumn seminar. With the agreement between the promise and execution, this project will remain as scene of successful Lighting Control.   

We have participated in the 1st and 2nd phase of Sejong City and also accomplished the smooth process and precise construction on the 3rd stage construction. We have installed the products and technologies with more ideas, so that we could operate with more convenient Lighting Control System.   

For 3-1 stage, there are 658 points for ON/OFF, 38 EA of Lighting Control Panels, 128 EA of Program Switches, 76 EA of Photo Sensors, 120 EA of DALI Masters, 40 EA of DALI Switches, 80 EA of Smart Touch Switches and 5,496 EA of DALI Dimming Modules are installed.   For 3-2 stage, there are 1,440 points for ON/OFF, 58 EA of Lighting Control Panels, 245 EA of Program Switches, 137 EA of Photo Sensors, 155 EA of DALI Masters, 402 EA of DALI Switches, 108 EA of Smart Touch Switches and 6,919 EA of DALI Dimming Modules are installed.   

 

 

 

 

 

Our DALI Dimming Module is configured as independent system in the world-wide, this project is one of most installed projects from our company. Our DALI System technology will be evaluated as the technology that no one cannot ignore. The DALI communication that developed from Europe was successfully operated and installed by our company in big project in Korea but it is not yet known in the world market. Gradually our result with DALI Project has been spreading and recognized through-out the world market these days. Our ELC System & SmarTrol Software can communicate with more than 10,000 points of Dimming Modules without no problem and our technology can check the monitoring status & maintenance status and we assume no one cannot prove this outcome by performance. We are able to find the value of this project as our perfect performance.  

 
 

sejong.png

 

 

 
 

 

Lotte World Tower

 

lot.png

 
 

The 2nd Lotte World is the project to be established as a Landmark Building

in Korea. The low floors were completed and opening was last Oct 13 ~ 15,

we have made every effort to check the Lighting Circuits and Lighting

Fixtures for this project for Perfect Opening.

In Oct 13, 2014, the Avenue Department was opened and in order, the other department

such as Shopping and Entertainment was opened and showed its merits to the public. With the luxurious interior decorations and outlines of luxury stores are revealed to show its true value. Despite the fact that tower is still under construction, it is becoming a popular spot for many regular customers and tourists. It was obvious that many related and many partner companies made their efforts to complete the construction.

In early 2013, our Lighting Control System was selected as lowest bid in the bidding

between Lotte Construction and the Lighting Control related companies. Along with the

gradual construction of architecture, our system was also delivered in stages and the

examples of special construction from this site was it used the LAN network for the

communication line. The communication line that has been installed at each floor and each area, we have established the communication network through our SCU (System

Communication Unit) that can acts converter for ELC Network. We have installed the 30 EA of SCU to utilize the existing LAN Network as the Lighting Control Communication Line and also we have managed to secure the smooth and quick communication network with the speed of 100MBPS.

Also, as another feature of Lighting Control System, there is no switch installed in the area

where regular customers stay so that light is not turned OFF by people. Our ELC System is able to monitor the status of each relay on each Lighting Control Panel and it was manually operated by facility personal. If necessary, the site control is possible in the nearest electricalroom.

In large store, we have installed additional software for controlling the lighting and also the

 

 

remote control is possible by monitoring the status of lighting and graphic screen of entire store itself. From the Central Monitoring Room, Integrated Monitoring Center and Main PC, our Lighting Control System is operated as Lighting Control System capable of simultaneousness remote control and status monitoring to recognized as convenient operating system for the Lotte Facility Team. At early 2015, we started to supply and install the Lighting Control System and at early 2017, we have completed the actual completion. The high-level area of tower also used the data communication network such as IBS (Fiber Optic Network) to establish the data communication for each floor’s Lighting Control Panel.

We have installed the DALI Dimming Module & ON/OFF Control for Office area for each LED Luminaire to control the individual

control for each LED.

 
 

 

Inchon International Airport 2nd Terminal

 

m1.png

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

m3.png
 
 

Incheon International Airport 2nd Terminal is in construction due to to be completed at Sep 2017. We will be supply the all systems by the end of 2016 and from the beginning of 2017, we have left for the commissioning of the system until completion.  We have already participated in Incheon Airport for Phase 1, Phase 2 and Transportation Center. Therefore we know very well for the conditions of Incheon Airport Area. The Lighting Control in this area is the infrastructure that considers reliability the most important compared to other buildings. Therefore, the system should be Redundant and Stand-Alone Type control panel structure so that even if there is one failure, it can be replaced it. Also the lighting is needed to be provided due to environment and schedule of the airport where the landing and takeoffs are frequently happened. it is a natural condition that the system should be linked control with the air navigation server.   According to the circumstances & conditions, our Lighting Control System provides the following systems and programs with great features.  .. First, the Central Monitoring System is configured as redundant structure so that even if one server fails, it will automatically switches to another standby server.  .. Second, each circuit has the current sensing circuit so that each electric power by each electric circuit is provided every 15 mins to BEMS System and Monitoring System. It is used as a monitoring function of the total & individual power loads.  .. Third, it is possible to control the schedule according to the sunset/sunrise time.

 

 

We did not have to make such an unreasonable task of setting the program for season schedule control every time.

 .. Fourth, it is connected at air navigation server to interlock control with Lighting Control for each entrance & exit area.  By the various functions and control programs, the Incheon International Airport 2nd Terminal is upgraded for Lighting Control System than existing 1st & 2nd Terminal.  Our Lighting Control System is installed at Incheon International Airport 2nd Terminal with reliability. It is expected to see the effect of building value of this facility as energy saving & efficient lighting load management.   

 
위로가기